how to build a porch roof on a manufactured homes

when the manufactured home construction and safety standards (mhcss), developed by hud, first went into effect . this older manufactured home once had an attached screened- in porch. the porch roof blew off and lifted portions of the home's roof. fortunately, the high winds lasted only seconds and.

build a front porch modular home front porch. it cannot be overstated how completely a front porch will change the overall look of your modular home . dormers are an inexpensive way to add character to your home by changing the silhouette of your house and adding some variety and character to your roof. dormers .

post re: attaching to a manufactured home. however if the manufactured home is installed on a permanent exterior foundation with pony i.e. knee walls similar to standard house construction then i understand that you can attach the exterior structures such as porches and decks .

mobile home can easily feel like a small place to live, including a porch addition can greatly enhance the feel of the space and provide additional room in which to spend time . it helps to place the post beams inside of the center holes of the cinder blocks to help make the deck more stable. double check the .

plans to their lines. if you do not have such a design, it may be worth- while developing one. combining a gable-end entry with a steep roof pitch creates the arche typal image of a home often desired. this configuration also allows you to provide a front. gable-end entry design. porch as part of .

porch to a manufactured home entails techniques similar to deck building. a handy . if you intend to build a roof over the porch, extend the corner posts high enough to support it . fasten the porch roof to the house with a horizontal lumber ledger board, bolted to the house wall studs at the top and rear of the roof.

manufactured homes? (1) roof over framing (dormer) additions to manufactured/mobile homes must meet the following requirements: (a) maintain a minimum twenty pound roof, live load, and provide documentation to the department. (b) the dead load for the dormer must be .